🌟 We're thrilled to present the latest updates to make your experience smoother and more efficient
✂️ Copy/Paste on Draft Evaluation Grid
We've extended the multi-select, copy, and paste functionality to the Evaluation grid for draft requests and revisions.
You can now easily auto-add new evaluation criteria to the grid when there aren't enough rows to fit pasted content.
✅ Stage approval optimisations
You can now issue stage approvals on Draft requests. Look for the "Approvals" tab next to the "Comments" on the right-hand side.
Cancelled stage approvals are now visible in the panel.
We've made various improvements to in-app notifications for stage approvals, including a new notification for a cancelled approval.
We have also fixed issues related to correct link usage in in-app notifications and notification badge accuracy.
✨ Exchange modal enhancements
Responding to requests is now even more of a breeze with these enhancements:
Enjoy inline actions and response forms that appear closer to the relevant fields.
The response form now appears inline over the top of the fields it affects.
Simple comments are now conveniently placed under the activity and comments panel, eliminating the need for a separate action.
Keyboard shortcuts for submitting and clearing responses are now clearly labeled and adapt to your operating system.
The response form will now auto-open when an exchange requires a response but none has been made, making response times faster.
🎨 Line Item Grid Header Style Improvements
Line item header cells have been revamped for a consistent and improved format.
To make it easy to understand, the field type (text, number, formula, etc.) is now indicated with an icon on the left-hand side.
The menu button style has also been updated to occupy less space to make room for the information that really matters
🕵️ Contracts - Downloadable CSV Audit Trail
We've introduced a downloadable audit trail for contracts
You can find it beside your team information on every contract (same place where it is on your requests!)
This feature is available retrospectively, so all previously created contracts now come with an associated audit trail.
🐞 Small but powerful improvements
Line item numbers now appear correctly in exchange tables, even on smaller screens.
Scrollbars will no longer obscure content within line item edit grids and similar views.
We fixed an issue that could cause a request with linked evaluation to crash when linked line items were edited by deleting and reordering items.
Contracts will no longer crash when accessing the audit trail.
Contract reminders will remain intact even if a sender user who is a recipient for the reminder is removed from the company.
The "Beta" label has been removed from the "Contracts" option in the nav bar.
We hope you enjoy these enhancements, and as always, your feedback is invaluable in making our platform better. Thank you for being a part of our community! 🚀